Underground Chilled Water Pipe Infrastructure Works at Makers District Development- Al Reem Island

LOCATIONABUDHABI – UNITED ARAB EMIRATESYEAR2023CONTRACTEMARAT ALOULA CONTRACTING L.L.C.CONTRACT VALUEAED 1,185,000.00ACTIVITIESWelding & Installation of Pre-Insulated Chilled Water Underground Cs Pipe & Fitting Inside Trenches.Share

SCOPE OF WORKS  

• Fabrication & Welding Works for Chilled Water Pipe Network.  

• Welding & Bolting of CS Joints, Fittings, Valve Chambers installation, temporary Loops’ installation, Tie-in connections with existing network etc.  

• Insulation of joints / aluminum cladding of joints and valve chambers.  

• Hydro Testing.  