SN Nature of Work and Project Name Contractor Client Value (AED) Year Remarks
01Novotel Pump SkidDAIKIN Middle East and Africa FZENovotel1,236,000.002022
02Proposed Chilled Water Network Connection to Aloft & EKFASouth Energy DWC-LLC1,185,623.202022
03JAFZA Trader Market – Sector 7 & 8 at Plot No. S51501, Jebel Ali Free ZoneMenasco Mechanical Contracting L.L.C.1,630,000.002021
04Fabrication, Welding and Installation of Pre-Insulated CS Pipes & Fittings including NDRC with Roller InstallationBin Lahej Electromechanical LLC1,560,000.002021
05Fixing & Rectification of Steel Structure & Bracket Glass, Dismantling & Packing of Structural Elements & Fixing of Steel Structure in IraqAl Nisr Roads & Building Contracting LLC1,182,160.002020
06HDPE Pipe & Fittings and Necessary Testing at Green Community Extension (PH-II & III)ASGH. Flora Boring Excavating Cont. LLCNational Properties1,521,296.002020HDPE
07Butt Welding of HDPE at Sharjah Waterfront City - Construction of Sun Island and Sector 02Al Hano Bldg Cont. LLC1,675,385.002020HDPE
08(NDRC) Fabrication, Welding & Installation of Pre-Insulated & GRP Pipes Inside Concrete Sleeves at CHW Piping Network Interconnection between JVC & JVTHills & Fort Construction L.L.C. (Consultant: DAR)Empower1,748,000.002019NDRC
09Fabrication, Welding, Installation & Insulation of Chilled Water Network at Dubai Studio City Phase–03 (Sec 01, 02 & 03) Consultant: DARHills & Fort Construction L.L.C.Empower1,020,980.002019CHW Network
10Fabrication, Welding & Installation of Pre-Insulated Pipes & Fittings at Emirates Flight Academy (EKFA) & Hospitality Plot Consultant: DARFala Road Contracting L.L.C.Dubai South1,267,830.002019
10Fabrication, Welding & Installation of Pre-Insulated Pipes & Fittings at Emirates Flight Academy (EKFA) & Hospitality Plot
Consultant: DAR
Fala Road Contracting L.L.C.Dubai South1,267,830.002019
11Fabrication, Welding & Installation of Pre-Insulated Pipes & Fittings at Dubai World Central – Al Maktoum Intl Airport
Consultant: DAR
Fala Road Contracting L.L.C.Dubai South1,153,377.502019
12Chilled Water Network Piping Work at Yotel Hotel, Business Bay & Al Wasl TowerBin Lahej Electromechanical L.L.C.Empower1,553,000.002019CHW Network
13Fabrication, Welding & Installation of MS Pipe at Bluewater Plaza EnhancementTornado Enterprises LLCBluwater Plaza993,080.002019
14Pre-Insulated Piping Work at Aloft Hotel & Element by Le Meridien HotelFlora Boring Excavating Cont. LLCAloft Hotel2,151,296.002018
15Chilled Water Pipe & HVAC Equipment Installation including Supports etc. & Handing-over at The Aviation District of Dubai SouthFlora Boring Excavating Cont. LLCDubai South2,100,000.002018
16Chilled Water Pipe & HVAC Equipment Installation including Supports, Fittings, Accessories, Insulation & Handing-over at Dubai Hills MallArma Elektropanc Electromechanical Cont. LLCEmaar935,000.002018
17Underground Pre-Insulated Chilled Water Network Pipe Works at GEMS SchoolSteel Const. Eng. Co L.L.CEmpower1,515,000.002018Under Ground Network
18Underground Pre-Insulated Chilled Water Network Pipe Works at Dubai Arena, City Walk Business Bay Phase 1 & 2 & Al Batha TowerSteel Const. Eng. Co L.L.CEmpower1,554,897.002018Under Ground Net
19Fabrication, Erection & Installation of Cooling Tower & Condenser Water Pipes at The Gardens 01Trane BVBANakheel1,670,000.002018Cooling Tower
20Chilled Water Network at Dubai Creek Harbour Development
Consultant: Allied Consultant
Steel Const. Eng. Co L.L.CEmaar1,754,801.852018Underground Network
21External Chilled Water Piping Network at Night Market & Boardwalk – Palm Deira
Consultant: AE7 Morse Arch & Eng Consultant
Flora Boring Excavating Cont. LLCUnited Engineering Const Co LLC1,206,124.002018Underground Network
22Chilled Water Plant Process Piping System at Town Square Cooling Plant DCP-01
Consultant: Hegazy Eng. Consultancy
Steel Const. Eng. Co L.L.CDistrict Cooling1,728,000.002017Underground Network
23Supply, Installation of HDPE Pipes and Fittings for Town Square Development Cooling Plant DCP-01
Consultant: Allied Consultant
Steel Construction Engineering Co L.L.CDistrict Cooling1,183,230.002017DPE
24Chilled Water Plant – Mechanical Equip, Installation, Fabrication, Welding, Erection & Fitting Up of Process Piping System at Souk Warsan Zone-1&2, Al Warsan
Consultant: AE7 Associates
Flora Boring Excavating Cont. LLCGINCO Gen Cont LLC1,600,000.002017District Cooling Plant
25Chilled Water Supply & Return System at ALM170 – E161 Emirates Hills
Consultant: CKR Consulting Eng.
ALEMCORaising Sun Investment1,230,000.002017Villa Network
26Welding, Fabrication & Installation of Duplex/SS Pipe at Metito Techno Park WarehouseMetitoMetito2,527,160.002017
27Underground Pre-Insulated Chilled Water Network Pipe Works at Deira Waterfront Development Phase 01Steel Construction Engineering Co L.L.CDeira Waterfront Development LLC3,400,000.002016Underground Network
28Mechanical Works Inside the Valve Chambers at Town Square Development Package 4 – CWN Phase 1Steel Const. Eng. Co L.L.CEmaar1,242,744.002016Underground Network
29HVAC Chilled Water System at Golden Finger, Dubai UAE
Consultant: Tebodin
Amana Steel Bld Cont LLCUnilever HPC Manuf.940,000.002016HVAC
30Underground Chilled Water Network at Bvlgari Hotel & Residences, Dubai UAE
Consultant: WSP
ALEMCO Elec Mech ServicesMeraas1,661,375.002016Underground Network
31Installation of Mechanical Equipment and Piping in Chiller Generator Plant (CGP) Building at AMMROC, Al Ain – UAEESCO JV (Joint Venture)Advanced Military Maintenance, Repair and Overhaul Center3,221,341.002015Chiller Plant
32Piping Work at Chilled Water Pump Room at Midfield Terminal Airport, Abu Dhabi
Consultant: AECOM PCE JV
AD Airport Company2,100,000.002015Pump Room
33Chilled Water Piping Work at ADNOC Temporary Guest House, Ruwais, Abu DhabiElmech Elec Mech Works LLCADNOC1,800,000.002015
34Chiller Module & Cooling Tower Work at Jebel Ali FZE, DubaiJohnson ControlsDanet960,000.002015
35Piping Network at Ghayathi Community Hospital, Abu DhabiAmana Walbridge JVGhayathi Community Hospital1,492,000.002014Underground Network
36District Cooling System at Dragon Mart Expansion Project Phase 2, DubaiADC Energy SystemsDragon Mart1,970,000.002014DCP
37Welding Services for IASTFMetito OverseasIASTF1,156,160.002014
38Piping Installation at Hydrocracker Unit 103, Takreer Ruwais Refinery, Abu Dhabi (Hyundai)Trans Middle EastHyundai1,328,000.002013Underground Network
39Takreer Refinery Site, Ruwais, Abu DhabiEd. Zublin AGTakreer2,565,580.002013
40HDPE & UPVC Works at Sheikh Zayed Desert Learning Center & UAE World Desert, Al AinCost Middle EastAl Ain Wildlife Park & Resort1,386,500.002013HDPE
41Piping Work for Infrastructure at Ghantoot Naval Base, Abu DhabiNHMCommand of Military Work1,400,000.002013
42Construction of Infrastructure Works (Pre-insulated Chilled Water & HDPE Pipe) at Ghantoot Naval Base for UAE Armed Forces – Command of Military Work, Abu DhabiStrabagCommand of Military Work2,470,000.002013HDPE
43Underground CS Piping Work at Non–Process Buildings, Package of Ruwais Refinery Expansion (EPC–6)NAFFCOTAKREER1,700,000.002013Underground Network
44Drainage Extension Work at Abu Dhabi Golf Club WestinBelhasa Group LLCTabreed2,100,550.002013
45Chilled Water Network at Tabreed Pipeline Network at District Cooling Plant, Abu DhabiBelhasa Group LLCTabreed1,200,000.002012Network
46DDP FEWA DAF, AjmanVeolia Water SolutionsFEWA2,600,400.002012
47Chilled Water & Condensed Water Piping Work at Ruwais Refinery Expansion ProjectFalcon Elec. Mech.TAKREER1,940,000.002012Network
48Mechanical Work at AD05-T-C-01-11 Tabreed Baynounah District Cooling Plant Room ExpansionBelhasa Group LLCTabreed1,250,000.002012
49Mechanical Work at Zayed University DCP-1 & DCP-2, Abu DhabiStella Group LLCZayed University1,350,000.002011
50Piping and Mechanical Equipment Installation for Automated Waste Collection Station at Jubail MarketTotus EnergySharjah Municipality1,487,000.002011
51Piping & ETC Work at Tabreed District Cooling Scheme AD01 International Petroleum Investment Co. HQ, Abu DhabiBelhasa Group LLCTabreed1,525,650.002011
52Piping & ETC Work at Tabreed District Cooling Scheme AD01 International Petroleum Investment Co. HQ, Abu DhabiBelhasa Group LLCTabreed1,125,600.002011
54CS Piping Work at Reem Island Abu Dhabi – DCP1ADC Energy SystemPAL Technology1,355,100.002010
55ETS Work & Connection to Tabreed CHW Network at JW Marriott, Abu DhabiBelhasa Group LLCTabreed1,650,500.002010
56Internal Piping & Heat Exchanger Work at IPIC Building AD-01 – Tabreed, Abu DhabiBelhasa Group LLCTabreed1,000,000.002010Underground Network
57Mechanical Work at Mixed Use Development Plot C, Abu DhabiTrans Middle EastTabreed1,400,000.002010
58Yas Island, Abu DhabiMetito OverseasYas Island950,000.002009
59Reem Island, Abu DhabiADC Energy SystemReem Island865,000.002009
60Jebel Ali Downtown Phase-2Headlay Int. LLCLimitless1,500,000.002009
61Emicool District Cooling PlantADC Energy SystemEmicool850,550.002009
62Mechanical Work at BEAAT Site, Ruwais, Abu DhabiSNC-Lavalin Int’lBEAAT550,000.002008
63Jebel Ali DowntownUltimate Dubai LLCLimitless1,800,000.002008
64Mechanical Work at Palm District Cooling, Jumeirah Lake Tower DC-3Stellar Group LLCPalm District Cooling450,000.002008