SN | Nature of Work and Project Name | Contractor | Client | Value (AED) | Year | Remarks |
---|---|---|---|---|---|---|
01 | Novotel Pump Skid | DAIKIN Middle East and Africa FZE | Novotel | 1,236,000.00 | 2022 | |
02 | Proposed Chilled Water Network Connection to Aloft & EKFA | South Energy DWC-LLC | 1,185,623.20 | 2022 | ||
03 | JAFZA Trader Market – Sector 7 & 8 at Plot No. S51501, Jebel Ali Free Zone | Menasco Mechanical Contracting L.L.C. | 1,630,000.00 | 2021 | ||
04 | Fabrication, Welding and Installation of Pre-Insulated CS Pipes & Fittings including NDRC with Roller Installation | Bin Lahej Electromechanical LLC | 1,560,000.00 | 2021 | ||
05 | Fixing & Rectification of Steel Structure & Bracket Glass, Dismantling & Packing of Structural Elements & Fixing of Steel Structure in Iraq | Al Nisr Roads & Building Contracting LLC | 1,182,160.00 | 2020 | ||
06 | HDPE Pipe & Fittings and Necessary Testing at Green Community Extension (PH-II & III) | ASGH. Flora Boring Excavating Cont. LLC | National Properties | 1,521,296.00 | 2020 | HDPE |
07 | Butt Welding of HDPE at Sharjah Waterfront City - Construction of Sun Island and Sector 02 | Al Hano Bldg Cont. LLC | 1,675,385.00 | 2020 | HDPE | |
08 | (NDRC) Fabrication, Welding & Installation of Pre-Insulated & GRP Pipes Inside Concrete Sleeves at CHW Piping Network Interconnection between JVC & JVT | Hills & Fort Construction L.L.C. (Consultant: DAR) | Empower | 1,748,000.00 | 2019 | NDRC |
09 | Fabrication, Welding, Installation & Insulation of Chilled Water Network at Dubai Studio City Phase–03 (Sec 01, 02 & 03) Consultant: DAR | Hills & Fort Construction L.L.C. | Empower | 1,020,980.00 | 2019 | CHW Network |
10 | Fabrication, Welding & Installation of Pre-Insulated Pipes & Fittings at Emirates Flight Academy (EKFA) & Hospitality Plot Consultant: DAR | Fala Road Contracting L.L.C. | Dubai South | 1,267,830.00 | 2019 | |
10 | Fabrication, Welding & Installation of Pre-Insulated Pipes & Fittings at Emirates Flight Academy (EKFA) & Hospitality Plot Consultant: DAR | Fala Road Contracting L.L.C. | Dubai South | 1,267,830.00 | 2019 | |
11 | Fabrication, Welding & Installation of Pre-Insulated Pipes & Fittings at Dubai World Central – Al Maktoum Intl Airport Consultant: DAR | Fala Road Contracting L.L.C. | Dubai South | 1,153,377.50 | 2019 | |
12 | Chilled Water Network Piping Work at Yotel Hotel, Business Bay & Al Wasl Tower | Bin Lahej Electromechanical L.L.C. | Empower | 1,553,000.00 | 2019 | CHW Network |
13 | Fabrication, Welding & Installation of MS Pipe at Bluewater Plaza Enhancement | Tornado Enterprises LLC | Bluwater Plaza | 993,080.00 | 2019 | |
14 | Pre-Insulated Piping Work at Aloft Hotel & Element by Le Meridien Hotel | Flora Boring Excavating Cont. LLC | Aloft Hotel | 2,151,296.00 | 2018 | |
15 | Chilled Water Pipe & HVAC Equipment Installation including Supports etc. & Handing-over at The Aviation District of Dubai South | Flora Boring Excavating Cont. LLC | Dubai South | 2,100,000.00 | 2018 | |
16 | Chilled Water Pipe & HVAC Equipment Installation including Supports, Fittings, Accessories, Insulation & Handing-over at Dubai Hills Mall | Arma Elektropanc Electromechanical Cont. LLC | Emaar | 935,000.00 | 2018 | |
17 | Underground Pre-Insulated Chilled Water Network Pipe Works at GEMS School | Steel Const. Eng. Co L.L.C | Empower | 1,515,000.00 | 2018 | Under Ground Network |
18 | Underground Pre-Insulated Chilled Water Network Pipe Works at Dubai Arena, City Walk Business Bay Phase 1 & 2 & Al Batha Tower | Steel Const. Eng. Co L.L.C | Empower | 1,554,897.00 | 2018 | Under Ground Net |
19 | Fabrication, Erection & Installation of Cooling Tower & Condenser Water Pipes at The Gardens 01 | Trane BVBA | Nakheel | 1,670,000.00 | 2018 | Cooling Tower |
20 | Chilled Water Network at Dubai Creek Harbour Development Consultant: Allied Consultant | Steel Const. Eng. Co L.L.C | Emaar | 1,754,801.85 | 2018 | Underground Network |
21 | External Chilled Water Piping Network at Night Market & Boardwalk – Palm Deira Consultant: AE7 Morse Arch & Eng Consultant | Flora Boring Excavating Cont. LLC | United Engineering Const Co LLC | 1,206,124.00 | 2018 | Underground Network |
22 | Chilled Water Plant Process Piping System at Town Square Cooling Plant DCP-01 Consultant: Hegazy Eng. Consultancy | Steel Const. Eng. Co L.L.C | District Cooling | 1,728,000.00 | 2017 | Underground Network |
23 | Supply, Installation of HDPE Pipes and Fittings for Town Square Development Cooling Plant DCP-01 Consultant: Allied Consultant | Steel Construction Engineering Co L.L.C | District Cooling | 1,183,230.00 | 2017 | DPE |
24 | Chilled Water Plant – Mechanical Equip, Installation, Fabrication, Welding, Erection & Fitting Up of Process Piping System at Souk Warsan Zone-1&2, Al Warsan Consultant: AE7 Associates | Flora Boring Excavating Cont. LLC | GINCO Gen Cont LLC | 1,600,000.00 | 2017 | District Cooling Plant |
25 | Chilled Water Supply & Return System at ALM170 – E161 Emirates Hills Consultant: CKR Consulting Eng. | ALEMCO | Raising Sun Investment | 1,230,000.00 | 2017 | Villa Network |
26 | Welding, Fabrication & Installation of Duplex/SS Pipe at Metito Techno Park Warehouse | Metito | Metito | 2,527,160.00 | 2017 | |
27 | Underground Pre-Insulated Chilled Water Network Pipe Works at Deira Waterfront Development Phase 01 | Steel Construction Engineering Co L.L.C | Deira Waterfront Development LLC | 3,400,000.00 | 2016 | Underground Network |
28 | Mechanical Works Inside the Valve Chambers at Town Square Development Package 4 – CWN Phase 1 | Steel Const. Eng. Co L.L.C | Emaar | 1,242,744.00 | 2016 | Underground Network |
29 | HVAC Chilled Water System at Golden Finger, Dubai UAE Consultant: Tebodin | Amana Steel Bld Cont LLC | Unilever HPC Manuf. | 940,000.00 | 2016 | HVAC |
30 | Underground Chilled Water Network at Bvlgari Hotel & Residences, Dubai UAE Consultant: WSP | ALEMCO Elec Mech Services | Meraas | 1,661,375.00 | 2016 | Underground Network |
31 | Installation of Mechanical Equipment and Piping in Chiller Generator Plant (CGP) Building at AMMROC, Al Ain – UAE | ESCO JV (Joint Venture) | Advanced Military Maintenance, Repair and Overhaul Center | 3,221,341.00 | 2015 | Chiller Plant |
32 | Piping Work at Chilled Water Pump Room at Midfield Terminal Airport, Abu Dhabi Consultant: AECOM PCE JV | — | AD Airport Company | 2,100,000.00 | 2015 | Pump Room |
33 | Chilled Water Piping Work at ADNOC Temporary Guest House, Ruwais, Abu Dhabi | Elmech Elec Mech Works LLC | ADNOC | 1,800,000.00 | 2015 | |
34 | Chiller Module & Cooling Tower Work at Jebel Ali FZE, Dubai | Johnson Controls | Danet | 960,000.00 | 2015 | |
35 | Piping Network at Ghayathi Community Hospital, Abu Dhabi | Amana Walbridge JV | Ghayathi Community Hospital | 1,492,000.00 | 2014 | Underground Network |
36 | District Cooling System at Dragon Mart Expansion Project Phase 2, Dubai | ADC Energy Systems | Dragon Mart | 1,970,000.00 | 2014 | DCP |
37 | Welding Services for IASTF | Metito Overseas | IASTF | 1,156,160.00 | 2014 | |
38 | Piping Installation at Hydrocracker Unit 103, Takreer Ruwais Refinery, Abu Dhabi (Hyundai) | Trans Middle East | Hyundai | 1,328,000.00 | 2013 | Underground Network |
39 | Takreer Refinery Site, Ruwais, Abu Dhabi | Ed. Zublin AG | Takreer | 2,565,580.00 | 2013 | |
40 | HDPE & UPVC Works at Sheikh Zayed Desert Learning Center & UAE World Desert, Al Ain | Cost Middle East | Al Ain Wildlife Park & Resort | 1,386,500.00 | 2013 | HDPE |
41 | Piping Work for Infrastructure at Ghantoot Naval Base, Abu Dhabi | NHM | Command of Military Work | 1,400,000.00 | 2013 | |
42 | Construction of Infrastructure Works (Pre-insulated Chilled Water & HDPE Pipe) at Ghantoot Naval Base for UAE Armed Forces – Command of Military Work, Abu Dhabi | Strabag | Command of Military Work | 2,470,000.00 | 2013 | HDPE |
43 | Underground CS Piping Work at Non–Process Buildings, Package of Ruwais Refinery Expansion (EPC–6) | NAFFCO | TAKREER | 1,700,000.00 | 2013 | Underground Network |
44 | Drainage Extension Work at Abu Dhabi Golf Club Westin | Belhasa Group LLC | Tabreed | 2,100,550.00 | 2013 | |
45 | Chilled Water Network at Tabreed Pipeline Network at District Cooling Plant, Abu Dhabi | Belhasa Group LLC | Tabreed | 1,200,000.00 | 2012 | Network |
46 | DDP FEWA DAF, Ajman | Veolia Water Solutions | FEWA | 2,600,400.00 | 2012 | |
47 | Chilled Water & Condensed Water Piping Work at Ruwais Refinery Expansion Project | Falcon Elec. Mech. | TAKREER | 1,940,000.00 | 2012 | Network |
48 | Mechanical Work at AD05-T-C-01-11 Tabreed Baynounah District Cooling Plant Room Expansion | Belhasa Group LLC | Tabreed | 1,250,000.00 | 2012 | |
49 | Mechanical Work at Zayed University DCP-1 & DCP-2, Abu Dhabi | Stella Group LLC | Zayed University | 1,350,000.00 | 2011 | |
50 | Piping and Mechanical Equipment Installation for Automated Waste Collection Station at Jubail Market | Totus Energy | Sharjah Municipality | 1,487,000.00 | 2011 | |
51 | Piping & ETC Work at Tabreed District Cooling Scheme AD01 International Petroleum Investment Co. HQ, Abu Dhabi | Belhasa Group LLC | Tabreed | 1,525,650.00 | 2011 | |
52 | Piping & ETC Work at Tabreed District Cooling Scheme AD01 International Petroleum Investment Co. HQ, Abu Dhabi | Belhasa Group LLC | Tabreed | 1,125,600.00 | 2011 | |
54 | CS Piping Work at Reem Island Abu Dhabi – DCP1 | ADC Energy System | PAL Technology | 1,355,100.00 | 2010 | |
55 | ETS Work & Connection to Tabreed CHW Network at JW Marriott, Abu Dhabi | Belhasa Group LLC | Tabreed | 1,650,500.00 | 2010 | |
56 | Internal Piping & Heat Exchanger Work at IPIC Building AD-01 – Tabreed, Abu Dhabi | Belhasa Group LLC | Tabreed | 1,000,000.00 | 2010 | Underground Network |
57 | Mechanical Work at Mixed Use Development Plot C, Abu Dhabi | Trans Middle East | Tabreed | 1,400,000.00 | 2010 | |
58 | Yas Island, Abu Dhabi | Metito Overseas | Yas Island | 950,000.00 | 2009 | |
59 | Reem Island, Abu Dhabi | ADC Energy System | Reem Island | 865,000.00 | 2009 | |
60 | Jebel Ali Downtown Phase-2 | Headlay Int. LLC | Limitless | 1,500,000.00 | 2009 | |
61 | Emicool District Cooling Plant | ADC Energy System | Emicool | 850,550.00 | 2009 | |
62 | Mechanical Work at BEAAT Site, Ruwais, Abu Dhabi | SNC-Lavalin Int’l | BEAAT | 550,000.00 | 2008 | |
63 | Jebel Ali Downtown | Ultimate Dubai LLC | Limitless | 1,800,000.00 | 2008 | |
64 | Mechanical Work at Palm District Cooling, Jumeirah Lake Tower DC-3 | Stellar Group LLC | Palm District Cooling | 450,000.00 | 2008 |