Deria Waterfront Development Phase 1

LOCATIONDUBAI – UNITED ARAB EMIRATESYEAR2016CONTRACTORAuthor naSTEEL CONSTRUCTION ENGINEERING CO. LLCmeCONTRACT VALUEAED 3,400,000.00ACTIVITIESUnderground Pre-Insulated Chilled Water Network Pipe Works Phase 01 DCP & Re Routing of Underground Chilled Water Network Pipe WorksShare

SCOPE OF WORKS

  • Laying of pipes and fittings.
  • Installation, welding and testing of underground pre-insulated pipes and fittings.
  • Installation of all free issued BFV, GV, AAV and Fittings as per provided drawings.
  • 100% UT for all welded joints.
  • Hydro Testing of Chilled water supply/return piping.
  • Joints painting.
  • Installation of insulation kits for all joints.
  • Rubber insulation & cladding for the pipe, fitting & valve inside valve chamber.
  • Support for flushing & passivation work.