SCOPE OF WORKS
Installation of valves, flanges, cladding, pipe supports, installation of CHW Pipe warning tape (laminated and detectable type) laid in trench along the buried piping route, installation of insulation and aluminum Cladding material for all pipes, valves and fittings inside all BVC Chambers and Connection to Existing Chilled Water Valve Chamber at site as per the project specification and in line with the scope of work bill of quantities and responsibility matrix as per the attached