Utilities Work At Kp1, Conttainer Storage Facility – AD Port – Abu Dhabi

LOCATIONABU DHABI – UNITED ARAB EMIRATESYEAR2022CONTRACTOREMARAT ALOULA CONTRATING LLCCONTRACT VALUEAED 1,266,925.00ACTIVITIESInstallation Of 315mm Dia HDPE Pipe in Excavated Trench with Required Welding.Share

SCOPE OF WORKS  

• Collect and Installation of 200mm dia HDPE ducts in excavated trench with required welding and coupling.  

• Assembling and installation of DI free issued fittings, valves, pumps, supports and accessories as per the approved drawings.  

• Collect and Installation of 80mm dia HDPE pipe ,welding include DA fitting and connection with tank  

• Collect and installation of 110mm dia HDPE/GRP Pipe in excavated trench required welding and coupling  

• GRP Pipe – Gravity Line  

• HDPE Pipe – Pressure Line  

• NSR-Type Isolation Valve (L/O)  